Repair and construction work is an extensive complex of various works, used in construction. They include: roofing, front, work on the construction of partitions, plastering, facing, painting, plumbing, electrotechnical, ventilation and air conditioning works, laying of water supply and fire alarm systems and others.
We offer a solution of any level from cosmetic repairs and finishing to complex capital construction and renovation. Experienced professionals, provided by us, carry out high-quality finishing and renovation of apartments, offices, cottages, a cafe, bars, restaurants, shops and other premises. The excellent quality of the work performed is ensured by many years of practice and an extensive list of completed projects.
Specialists, provided by our company, work only with trusted and reliable suppliers of building materials and construction equipment, therefore, our repair and construction work is always of high quality, and get high marks from customers.
FINISHING WORK | ||
---|---|---|
Preparatory work for leveling surfaces | ||
Name of works | Unit. ed. | Price of, rub. |
Plastering walls with dry mixes on lighthouses | m2 | 300 |
Wall plaster beacon | m2 | 250 |
Partial wall alignment / ceiling (hauling) | m / n | 220 |
Screed production up to 5 cm | m2 | 300 |
The device of self-leveling self-leveling floors | m2 | 230 |
Painting works | ||
Name of works | Unit. ed. | Price, rub. |
Wall putty for wallpaper | m2 | 200 |
Wall putty for painting | m2 | 300 |
Priming the surface two to three times (walls / floor / ceiling) | m2 | 90 |
Painting the wall / ceiling in two layers (enamel, water emulsion) | m2 | 200 |
Slope finishing - complex price | m / n | 480 |
Installation of PVC ceiling skirting board with painting | m / n | 130 |
Pasting walls with non-woven wallpaper, vinyl, for painting | m2 | 200 |
GKL finishing (plasterboard installation) | ||
Name of works | Unit. ed. | Price, rub. |
Wall decoration GKL (plasterboard installation) | m2 | 350 |
Manufacturing of a L-shaped box from gypsum board | m / n | 400 |
The device of partitions from gypsum board | m2 | 700 |
GKL ceiling installation (drywall) in one level | m2 | 400 |
Ceiling type device "Reichny" or " Armstrong" | m2 | 340 |
Thermal and sound insulation of walls / ceilings | m2 | 100 |
INSTALLATION OF CERAMIC TILES | ||
---|---|---|
Laying ceramic tiles | ||
Name of works | Unit. ed. | Price, rub. |
Laying ceramic tiles on walls / floors with grout standard format without diagonal grout standard (25*40, 30*30, 40*40) | m2 | 750 |
Laying porcelain stoneware on walls / floors with grout standard format without diagonal with standard grout | m2 | 750 |
Laying ceramic tiles 10*10 to the kitchen work area | m2 | 900 |
Mosaic laying | m2 | 1500 |
Grouting with an epoxy-based mixture | m2 | 450 |
Saw the tiles at an angle 45 degrees | m / n | 650 |
Laying the frieze in one thread of the finished standard / curly (convex) | m / n | 300 |
Laying a frieze from mosaics or type-setting elements | m / n | 550 |
Leveling the floor with a bulk mixture | m2 | 220 |
Manufacturing of waterproofing | m2 | 220 |
Surface priming in one layer | m2 | 45 |
Making holes in tiles (small / big) | PCS | 140 / 200 |
Screed making / plaster | m2 | 300/300 |
PLUMBING WORK | ||
---|---|---|
Filters, water meters | ||
Name of works | Unit. ed. | Price, rub. |
Installing a coarse water filter | PCS | 250 |
Installation of a shut-off valve | PCS | 250 |
Installing the magnetic transducer | PCS | 500 |
Installation of a fine water filter | PCS | 500 |
Installing a water pressure reducer | PCS | 500 |
Installing the counter - water meter (water meters) | point | 1000 |
Water supply system, sewers, heating | ||
Name of works | Unit. ed. | Price, rub. |
HVS point eyeliner, GVS, sewers | point | 800 |
Sewerage piping for plumbing devices up to DU100 | point | 800 |
Installing a bathroom drain with design gratings (internal / outer part) | PCS | 2000 |
Pipe laying to DN 32 in insulation inside the building, highway | mp | 100 |
Installing the plug / traffic jams | PCS | 50 |
Replacing the water pipe in the apartment DU25 / DU40 (slab perforation, pipe dismantling, threading, installation of pipe and branch, system connection, pipe fixing, filling the slab opening with foam) | PCS | 2800/3500 |
Dismantling water pipes | point | 300 |
Slitting on concrete for a pipeline 20 mm in one strand | m / n | 500 |
Slitting on a brick for a pipeline 20 mm in one strand | m / n | 350 |
Slitting in a concrete wall for a 50mm pipeline in one thread | m / n | 700 |
Strobing in a brick wall for a 50mm pipeline in one thread | m / n | 400 |
Assembly and installation of an aluminum heating radiator | point | 2800 |
Installation of a heating radiator after dismantling | point | 450 |
Dismantling the cast iron heating radiator | point | 450 |
Other | ||
Name of works | Unit. ed. | Price, rub. |
Installation of warm water floors | m2 | 400 |
Collector installation | PCS | 1500-2000 |
Manifold cabinet installation | PCS | 1000 |
Circulation pump installation | PCS | 1500 |
Fecal pump installation | PCS | 1500 |
Expansion tank installation | PCS | 500 |
ELECTRIC INSTALLATION WORK | ||
---|---|---|
Electrical work on the installation of electrical wiring | ||
Name of works | Unit. ed. | Price, rub. |
Installation of a wiring point for a socket / switch / soldering box (removal and isolation of contacts) | point | 240 |
Slitting a hole in the wall with the installation of a socket in concrete / brick | point | 150/100 |
Installation of the socket, switch (without box) | point | 150 |
installation of junction boxes and welding ends | work. | 150 |
Cabling, open wires using mounting brackets | m / n | 30 |
Cabling, wires in a corrugated pipe | m / n | 70 |
Laying the wire with gouging in plaster | m / n | 100 |
Laying of wire with slitting in brick and foam concrete | m / n | 150 |
Laying wire with slitting in concrete | m / n | 200 |
Installation of an electrical panel for apartment externally | PCS | 700 |
Installation of an electrical panel for an apartment internally with perforated walls | PCS | 1200-1300 |
Circuit breaker installation | PCS | 250 |
Installing diffautomat (RCD) | PCS | 350 |
Installation of an exhaust fan in bathrooms | PCS | 350 |
Electrical installation work for lighting installation | ||
Name of works | Unit. ed. | Price, rub. |
Chandelier mounting standard (assembly, hook attachment, connection) | PCS | 500 |
Mounting a wall lamp, sconce (assembly, hitch, connection) | PCS | 300 |
Installation of false ceiling spotlights | PCS | 150 |
Installation of false ceiling spotlights with cutting holes in the gypsum board | PCS | 250 |
Installation of ceiling luminaire | PCS | 650 |
Installation of a transformer for lighting 12 volt | PCS | 350 |
Installation of voltage stabilizers | ||
Name of works | Unit. ed. | Price, rub. |
Installation of a 1-3-phase electromechanical VOLTAGE STABILIZER | PCS | 1500-2500 |
DOOR INSTALLATION | ||
---|---|---|
Installation of interior doors | ||
Name of works | Unit. ed. | Price, rub. |
Interior door installation (box assembly, stitching, door hinge, block installation, latch insert, installation of an extension and a casing on both sides) | PCS | 3500 |
Installation of a wooden door from an array of valuable wood species (washed down and assembly of the box, stitching, door hinge, block installation, latch insert, installation of an extension and a casing on both sides) | PCS | 4500 |
Installation of an interior door with a sliding system with an opening cashing on one side and an extension in the opening | PCS | 4400 |
Setting the threshold | PCS | 300 |
Dismantling an interior door with a frame | PCS | 400 |
Installing the door opener | PCS | 100 - 200 |
Finishing of the opening with an extension and a casing on both sides | PCS | 2500 |
Installation of entrance doors | ||
Name of works | Unit. ed. | Price, rub. |
Installation of a metal door in a prepared opening, foaming seams ( depending on the manufacturer, weight and size) | PCS | 3100 |
Expansion of the opening for the installation of a metal brick door / concrete | side | 500 / 1000 |
Dismantling a metal door | PCS | 700 |
Closer installation | ||
Name of works | Unit. ed. | Price, rub. |
Installation of a door closer on an interior door | PCS | 1000 |
Installation of a door closer on a metal door | PCS | 1500 |
INSTALLATION OF FLOOR COVERINGS | ||
---|---|---|
Floor arrangement | ||
Name of works | Unit. ed. | Price, rub. |
Floor surface priming | m2 | 45 |
Minor screed repair | m2 | 100 |
Leveling the floor with a bulk mixture | m2 | 220 |
Laying the lock laminate in a straight line | m2 | 240 |
Laying the parquet board with the lock on the substrate in a straight line | m2 | 350 |
Installation of plastic skirting board | m / n | 120 |
Installation of MDF skirting boards | m / n | 280 |
Laying quartz vinyl tiles on glue | m2 | 350 |